top of page

Search


DSM Contract Lifting | Lift and Shift | Chiller Compressors
Todays lifting task required the replacement of two 950kg chiller compressor units which were located on a roof. Space was limited, but...

DSM
Jul 16, 20211 min read


DSM Contract Lifting | Lift and Shift | Crac Units
Todays lifting task was to lift 8 crac units weighing a total of 950KG each. This job required the installation and a host located on the...

DSM
Jun 27, 20211 min read
bottom of page

