top of page

Search


DSM Contract Lifting. Collaborative Efforts: Specialist Equipment in Action.
Our DSM Contract Lifting and Plant Movement teams collaborated closely on a challenging task: installing 3 tonne Excool units. Utilising...

DSM
Apr 30, 20241 min read


Scaling New Heights: The DSM Plant Movement Team's Journey with the ArcelorMittal Orbit.
DSM recently undertook a remarkable project involving the iconic ArcelorMittal Orbit, originally installed for the 2012 Olympic Games. Standing at 114.5 metres, our dedicated Plant Movement team showcased their expertise by skilfully dismantling the chiller into manageable pieces, which were then navigated through tight spaces. Are you looking for a reliable Plant Movement partner? Please get in touch with the team today. 📧 Email: contracts@dsmcls.co.uk 📞 Tel: 0203 948 9659

DSM
Mar 21, 20241 min read


How to Ensure a Safe and Precise Contract Lift for a 32 Tonne Pre-Fabricated Plant Room with Off-Centre Gravity.
We recently tackled a challenging project involving the Contract Lifting of a 32 tonne pre-fabricated plant room, with the centre of...

DSM
Mar 20, 20241 min read
bottom of page

