DSM played a vital role in advancing the South London decarbonisation scheme by expertly installing a 25-tonne package plant room and two Air Source Heat Pumps (ASHPs) onto a school roof in Lambeth. This challenging task demanded careful coordination and detailed execution to ensure seamless integration with the existing infrastructure.
Are you looking for a reliable Plant Movement partner? Please get in touch with the DSM Contract Lifting team today.
📧 Email: contracts@dsmcls.co.uk
📞 Tel: 0203 948 9659






Comments